Readiness explorer
See readiness come together
Start at the top of a property and drill down, one level at a time, to a single requirement. At every level you see the state, the reason and the evidence it is built from.
Illustrative property with sample data. Not a customer.
- Ready
- Partially ready
- Not ready
- Unknown
-
01 / The property
One property, one state
The Superior Grand is a fictional hotel with 5 floors, 84 rooms and 8 garden bungalows. As a whole it is partially ready. That state is not entered by hand: it is built from the evidence underneath, level by level. Start at the top, then go down to one requirement.
-
02 / Locations
Pull the floors apart
Each floor can be read on its own. Rooms ready: 14 of 14 on Floor 1, 13 of 18 on Floor 2, 17 of 18 on Floor 3, 18 of 18 on Floor 4 and 16 of 16 on Floor 5. A floor is a location: it reads its rooms, so Floor 2 is partially ready while 5 of its 18 rooms are not fully ready.
-
03 / Rooms
Floor 2: 18 rooms, each with its own state
Floor 2 holds rooms 201 to 218, and each room has its own state. By state: 13 ready, 2 partially ready, 2 not ready, 1 unknown. Rooms 204, 207, 211, 213 and 215 are the ones worth a conversation at 07:00.
-
04 / Things
Inside Room 204, every thing has its own record
Inside Room 204 are 5 things: air handler AHU-204, minibar MB-204, door lock LK-204, in-room safe SF-204 and bathroom fixtures BF-204. Each thing has its own record and its own readiness policy. The room does not repeat their rules. It reads their verdicts.
-
05 / Readiness policy
One policy for every room of this type
Every room of this type follows one readiness policy, written once: Guest-ready room. It has 5 requirements (4 blocking, 1 degrading): turned since last checkout, inspection after cleaning recorded, no open repair, room temperature within the safe band and in-room equipment ready. Blocking means the room cannot be ready while the requirement fails. Housekeeping, maintenance and outside vendors all work toward the same list.
-
06 / Requirement
The air handler fails its requirement
The air handler has a policy of its own. Its requirement is “Serviced within 90 days”, severity blocking. The record for AHU-204 says: Serviced 94 days ago, limit 90 (4 days overdue). The requirement fails, and because it is blocking, Room 204 cannot be ready.
- Requirement
- Serviced within 90 days Blocking
- Evidence
- Serviced 94 days ago, limit 90 (4 days overdue)
- Result
- Failed
- Verdict
- Room 204: Not ready
Air handler AHU-204
-
07 / Verdict and engine
From not ready to ready, without a phone call
Room 204 was not ready. Reason: Air handler AHU-204 service is overdue by 4 days. The readiness engine raised the service to maintenance at 07:02, the technician recorded it at 09:40, and the check ran again at 09:41. Room 204 is ready, and no one chased it by phone.
- Requirement
- Serviced within 90 days Blocking
- Evidence
- Service recorded 09:40, limit 90
- Result
- Met
- Verdict
- Room 204: Ready
Air handler AHU-204
-
08 / Roll-up
The state rolls up to the floor and the property
With Room 204 ready, Floor 2 now reads 14 of 18 rooms ready. It stays partially ready, because rooms 207, 211, 213 and 215 are not fully ready. The property reads its floors and its garden, so The Superior Grand is partially ready too. Nobody counted by hand.
-
09 / The same model, outside
The garden bungalows follow the same model
Outside the main building, 8 garden bungalows are modeled the same way. Each has things of its own: air handler, minibar, door lock, plunge pool pump and outdoor shower. Their policy is Guest-ready bungalow, which builds on the room policy and adds one requirement: plunge pool water tested today. By state: 6 ready, 1 not ready, 1 unknown.
-
10 / Done is not ready
Every team finished, and the bungalow is still not ready
Housekeeping cleaned and inspected Bungalow 3 by 17:36 yesterday, and maintenance closed a repair on its outdoor shower at 18:10. Every task is done, yet the bungalow is not ready: the repair came after the inspection, so the inspection no longer covers it. The check at 07:00 names the gap, and the engine raises the inspection to housekeeping at 07:02. It is the pattern SuperAssets started from: finished work that still leaves a bungalow short of the standard.
-
11 / Unknown
No water test today: unknown
Bungalow 6 has no plunge pool water test on record today, and that requirement is blocking. With no evidence the verdict is unknown, never a pass. Next step: Evidence needs review. No task created.
-
12 / Summary
A long standard becomes one state
Floor 2 and the garden bungalows alone have 242 requirements to meet, each checked against its own evidence. You do not read them. You read one state per level, with its reason, and open the evidence only when you need it. The standard is written once, shared by every team, and no longer lives in one person’s head.
Now see your own property
Pick one room type. We map it from the records you already have and send you its readiness as a one-page report. Free, no commitment.
Want this view of your own property? Get my free room report →
In view
See this for your own property
Ask for a free room report: one room type, mapped from the records you already have, on one page.